OPERATIONAL PLANNING
Mission Planning
Create and review routes with explicit safety gates. Physical execution remains unavailable until hardware is connected and verified.
MISSION PLAN, NO LIVE DRONE CONNECTION
OPERATIONAL LAYERS
Orchard boundary
Review priority
Planned route
Demonstration anomaly
Orchard review route
StatusDraft
Waypoints6
DistanceCalculated from route
Est. duration18 min · simulated
VehicleNo hardware assigned
Data sourceDemonstration geometry
Safety checklist
Boundary validationPassed in software
Altitude constraintsConfigured
Weather sourceNot live
Vehicle healthUnavailable
Operator authorizationRequired for hardware